Project Description
This project consisted of a complete gut and renovation of the existing Library building. New structural steel brace frames were installed from the basement level through the roof. All new MEP systems were included along with all new finishes throughout. A new roof was installed and all new storefront windows were installed on all levels.
Owner
Department of Enterprise Services
Architect
Mithun
Contract
$23.3M
Completion
May, 2024